VASA HGM-YJ-GL Pre-stressing Pipeline Grout for Road Bridge is a product specialized for post-tensioning prestressed pipe (hole) grouting construction. It is formulated from a variety of high-quality cementitious materials and high-performance additives, featuring excellent flowability, stable slurry, adjustable setting time, no shrinkage, slight expansion, high strength, and non-corrosiveness to steel reinforcement.

Specifications

PRODUCT INFOMATION

 

The finished product technical specifications comply with the requirements outlined in JTG/T 3650-2020.

No.

Item

Performance Index

1

Water-Powder Ratio

0.26~0.28

2

Setting Time/h

Initial Setting ≥5

≥5

Final Setting ≤24

≤24

3

Flowability(25°C)/s

Initial Flowability 10~17

10~17

30min Flowability

10~20

60min Flowability

10~25

4

Bleeding Rate/%

24h Free Bleeding Rate

0

3h Wire-to-Wire Bleeding Rate

0

5

Pressure Bleeding Rate/%

0.22MPa

(when vertical hole height ≤1.8m)

≤2

0.36MPa

(when vertical hole height ≤1.8m)

6

Filling Capacity

Qualified

7

Compressive Strength/MPa

3d

≥20

7d

≥40

28d

≥50

8

Free Expansion Rate/%

3h

0~2

24h

0~3

9

Flexural Strength/MPa

3d

≥5

7d

≥6

28d

≥10

TECNICAL INFOMATION 

 

Product Technical Parameters

Packing Specification

25kg/bag

Character

Grey mortar

Executive Standard

JTG/T 3650-2020

Mixing ratio

 Powder: Water = 1:0.26-0.28 (by weight)

Shelf life

6 months when stored unopened in a cool, dry place.

Construction

Technical Parameters

Construction Environment

2-3t/m³

Construction Consumption

Working temperature 5°C~35°C.

Outdoor construction should be avoided in high temperature, frost, direct sunlight, or windy rainy weather. When the temperature is below 5°C, insulation measures should be done.

Operable Time

40min

APPLICATION PROCEDURE

 

· Determine the water quantity based on the recommended water-cement ratio. Start by adding 4/5 of the water, gradually mixing while adding the powder. After adding all the powder, continue mixing for 2 minutes, then add the remaining mixing water and continue mixing for another 2 minutes until the slurry is uniform.

· Grouting of the ducts should be performed within 48 hours after the final tensioning. Before grouting, ensure there are no debris or standing water inside the ducts.

· Prior to injecting the grout into the ducts, activate the grout pump to expel a small amount of grout. Only proceed to inject into the beam ducts when the expelled grout's fluidity matches that in the mixing tank.

· The grouting pressure should not exceed 0.6 MPa. The grout filling should reach the opposite end of the duct and continue until the air vents expel grout with the specified fluidity. After closing the grout outlet, maintain a stabilizing pressure period of no less than 0.5 MPa for at least 3 minutes.

· Grouting should follow a bottom-up sequence. Grouting of the same duct should be continuous and completed in one go. The time from mixing the grout to completing the grouting should not exceed 40 minutes, and continuous mixing should be maintained before and during the injection process.

· During grouting, the grout temperature should be between 5°C and 35°C. Within 3 days after grouting, the temperature of the beam and the environment should not fall below 5°C. If the ambient temperature exceeds 35°C, construction should be scheduled during cooler periods.

FEATURES AND BENEFITS

 

· Excellent fluidity and high strength ensure minimal leakage and no layering issues.

· Exceptional durability is achieved through the use of inorganic grouting material, offering resistance to reinforcement corrosion, ensuring longevity, and robustness.

· Rapid development of full strength upon grouting, coupled with slight expansion and other advantageous traits.

· High filling capacity facilitates one-time grouting application, resulting in a dense, pore-free slurry within the pipeline.

· Prestressed steel bars exhibit corrosion resistance and form a strong bond with concrete.

Scope of Application

· Post-tensioned prestressed bridge grouting for various highway applications.

· Grouting of large-scale prestressed structural ducts.

· Sealing grouting at various concrete structure joints.

· Curtain grouting, anchoring grouting, void filling, or repair, etc.

 

FAQ
  • Q1: What are the main product series of VASA?
    VASA's main product lines include tile and stone pasting series, waterproof mortar series, cement-based grouting material series, wall leveling and skimcoat series, inorganic flooring series, soil solidification products, etc.
  • Q2: Where is VASA's main production base?
    VASA's main production bases are distributed throughout China, and there is also a factory in Johor Bahru, Malaysia.
  • Q3: What is VASA's production capacity?
    The production capacity of VASA dry powder mortar products is approximately 7 million tons.
  • Q4: The production capacity of VASA dry powder mortar products is approximately 7 million tons.
    The reference delivery time for VASA products is seven days within China, sea freight to South East Asia: 7-10 days; Europe/Americas: ~25–35 days; Latin America: ~20-45 days
  • Q5: Has VASA's product been certified for environmental protection? What are the certifications?
    VASA's products have undergone environmental certification, including German GEV-EMICODE certification and French A+ certification.
  • Q6: What is the main packaging form of VASA products?
    VASA's products are mainly packaged in valve pockets and transported on wooden pallets.
  • Q7: What are the auxiliary installation and construction supports?
    We can provide construction videos of our main products to guide their construction.
Send Your Message To Us
* Product Name:
* E-mail:
* Contact Number:
Company Name:
* Details:
VASA® HGM-YJ-GL

Pre-stressing Pipeline Grout for Road Bridge

Ref Price:
Customisation:
Features & Benefits
  • Excellent fluidity and high strengthExcellent fluidity and high strength
  • Rapid development of full strength upon groutingRapid development of full strength upon grouting
  • High filling capacity facilitates one-time grouting applicationHigh filling capacity facilitates one-time grouting application
pdet_rf_icon6Follow US:
pdet_rf_icon7
Effective Logistical Security
pdet_rf_icon8
The Strictest Quality Assurance
pdet_rf_icon9
Online Customer Service
formpop_closeformpop_closeon
Get Latest Price
Help us more accurately and quickly offer you a quotation by telling us more!
* Product Name:
* E-mail:
* Quantity required:
*Contact Number:
Company Name:
* Details:
formpop_closeformpop_closeon
Available
Feel free to approach us for customised products, we will be in touch with you soon!
* Product Name:
* E-mail:
* Quantity required:
*Contact Number:
Company Name:
* Details:
formpop_closeformpop_closeon
We'd welcome your feedback!
How likely would you be to recommend OYHORDER.COM to a friend or colleague?
0 - Not likely at all
10 - Extremly likely
Please kindly tell us what could be done to improve your experience?
This field must not be empty
pop_close
pop_ico1
Are you sure to delete it?
pop_img3
pop_close
pop_ico2.svg
The shopping cart is empty and the order cannot be submitted
pop_img3.svg
Ok
pop_close
pop_ico3
Under development, please stay tuned
pop_img3
Ok