PRODUCT INFOMATION
The product complies with the requirements outlined in JC/T 984-2011 "Polymer Cement Waterproofing Mortar." Specific technical indicators are as follows:
|
ITEM |
Data |
||
|
Setting Time |
Initial setting/min, ≥ |
45 |
|
|
Final setting/h, ≤ |
24 |
||
|
Impermeability Pressure/MPa |
Coating specimen, ≥ |
7d |
0.5 |
|
Mortar specimen, ≥ |
7d |
1.0 |
|
|
28d |
1.5 |
||
|
Compressive Strength/MPa, ≥ |
24.0 |
||
|
Flexural Strength/MPa, ≥ |
8.0 |
||
|
Flexibility (Transverse Deformation Capacity)/mm, ≥ |
1.0 |
||
|
Bond Strength/MPa, ≥ |
7d |
1.0 |
|
|
28d |
1.2 |
||
|
Alkali Resistance |
No cracking, peeling |
||
|
Heat Resistance |
No cracking, peeling |
||
|
Frost Resistance |
No cracking, peeling |
||
|
Shrinkage Rate/%, ≤ |
0.15 |
||
|
Water Absorption Rate/%, ≤ |
4.0 |
||
TECHNICAL INFOMATION
|
Product Technical Parameters |
Packing Specification |
5kg/ barrel of liquid material +25kg/ bag of powder material |
|
Character |
Milky liquid material 、 gray powder material |
|
|
Executive Standard |
JC/T984-2011 "Polymer Cement Waterproof Mortar" Type II |
|
|
Shelf Life |
12 months when stored unopened in a cool, dry place. |
|
|
Mixing Ratio |
Liquid: Powder = 1:5 (weight ratio) |
|
|
Construction Technical Parameters |
Operable Time |
45min |
|
Operable Environment |
Temperature 5-35°C. Avoid construction in rainy, windy (above grade 5) |
|
|
Consumption |
2.0kg/m²/mm |
APPLICATION PROCEDURE
· Substrate Treatment
Thoroughly clean the substrate to remove dust and oil. Remove protruding and loose parts and repair damaged areas with quick-setting mortar. Wet the substrate thoroughly with clean water, but no standing water should remain.
· Preparation of Mortar
The mixing ratio of the product is liquid: powder = 1:5 (mass ratio). Add the liquid component into the mixing bucket first, then add the powder component, and mix quickly and evenly with a mechanical stirrer. The prepared mortar must be used within 45 minutes, and no additional water should be added during use.
· Application of Mortar
a. Single construction thickness is about 2mm ~ 4mm.
b. The mortar after mixing is evenly divided into batch scraping construction according to the specific construction thickness design requirements, and the second construction is carried out after the first waterproofing mortar is hardened, and so on.
c. After the completion of the last scraping glue, the curing time shall be not less than 7 days after it is hardened.
d. The total thickness of the final mortar layer shall not be less than the design thickness.
FEATURES AND BENEFITS
· Strong bonding with the base and surface materials, no peeling off.
· Machine sprayable, batch able
· Suitable for both waterfront and backwater
· Low shrinkage and better impermeability
· Waterproofing and seepage-proofing works for external walls of buildings
· waterproofing and moisture-proofing works on the interior walls of buildings, kitchens and restrooms walls
· Underground (such as pile head, garage, tunnel, etc.) waterproofing project
Low shrinkage and better impermeability
Suitable for both waterfront and backwater
Machine sprayable, batch able
Strong bonding with the base and surface materials, no peeling off