Characteristics and Packaging
|
Item |
Data |
|
Package |
Curled into a cylindrical, using suitable packaging material. |
|
Width (m) |
1.2, 2.4 |
|
Thickness (mm) |
1.2, 1.5, 1.7 |
|
Length (m) |
20 or Customized |
|
Area (m2/roll) |
24, 48 or Customized |
Properties
|
Description |
Test Methods |
Typical Values |
|
Tensile Strength |
ASTM D412 |
21 MPa |
|
Elongation at Break |
ASTM D412 |
500% |
|
Puncture resistance |
ASTM E154 |
1000 N |
|
Peel adhesion to Concrete |
ASTM D903 |
1800N/m |
|
Resistance to hydrostatic head |
ASTM D5385 |
71m |
|
Peel strength in lap |
ASTM D1876 |
1000N/m |
|
Crack cycling |
ASTM C1305 |
-23℃, 100 cycles no crack |
|
Water vapour transmission |
ASTM E96 B |
0.0043g/(m2 .h) |
|
Flexibility at low temperature |
ASTM D1970 |
-29℃ |
Note: The above data were tested under standard conditions (temperature 23 ℃ ± 2 ℃, relative humidity 50% ± 10%).
Application Instructions
Accessories: PMH-T-160 Butt Joint tape, PMH-T-S80 Particle Cover Tape, PMH-S-600 Sealant, PMH-T-B250D Double-sided Butyl Tape, etc.
Construction Tools: Pressing plates, Rollers, Hot Welding Gun, etc.
Application Instructions
Horizontal Installation:
Substrate Preparation→Set Guide Lines→Lay Pre-applied Waterproof Membranes→Overlap Treatment→Detailing at Nodes→Reinforcing Steel Bar Binding→Concrete Pouring
Vertical Wall Installation:
Install Vertical Supports→Set Guide Lines→Lay Pre-applied Waterproof Membranes→Mechanical Fixing of Membrane→Overlap Treatment→Detailing at Nodes→Reinforcing Steel Bar Binding→Concrete Pouring
Tunnel Arch Construction:
Initial Surface Treatment of Primary Support → Laying and Fixing Geotextile→Lay Pre-applied Waterproof
Advantages
· Excellent mechanical properties, high tensile strength and puncture resistance.
· Full and permanent bond with post-poured concrete, no lateral water migration.
· Variety of overlapping methods, can be either bonded or welded.
· Allows maximum use of confined sites.
· Simplified construction procedures and reduced costs, no need for a protective concrete layer, directly tie the re-bar and pour the concrete, reducing the consumption of manpower, materials, and machinery.
· Efficient process and environmentally friendly, cold apply, no primer.
Excellent mechanical properties
Permanent concrete bond & anti-water migration
Flexible overlapping methods
Optimized for confined sites
Simplified construction & cost saving
Cold-applied & eco-friendly process
Compatible with sidewall waterproofing systems